Free Downloads for GCs & Tower Owners
Printable field checklists and a rigging plan template, built from how we actually run jobs. Fill in your work email and we'll send the link — same PDF, no catch.
Closeout
Tower Closeout Package Checklist
What a GC or PM should require in a tower crew's closeout package before signing off and releasing final payment.
- Before/after photos by category, labeled by sector
- Torque, plumb & weatherproofing verification
- RF sweep/PIM reports, RET & azimuth/tilt records
- As-builts, material reconciliation & punch list sign-off
Rigging
Rigging Plan Template — ANSI/ASSP A10.48
A fillable rigging plan built around ANSI/ASSP A10.48 — lift classification, load data, equipment, anchor points and pre-lift sign-off.
- Lift classification (Class I–IV) reference
- Load description, rigging equipment & WLL log
- Sling angles, anchor points & structural approval
- Personnel roles, weather limits & pre-lift sign-off
Site Walk
Pre-Construction Site Walk Checklist
A pre-mobilization site walk checklist to catch access, structural and documentation gaps before the crew shows up.
- Access, compound & ground conditions
- Structure condition & existing equipment vs. drawings
- RF signage, lighting, rescue plan & nearest hospital
- Discrepancy log + required photo list